A behemoth V164 offshore wind turbine from Danish company MHI Vestas Offshore Wind has produced almost 216,000 kWh over a 24-hour period during tests at its site near Østerild, Denmark in December. In doing so, the 9 MW prototype – a reworked version of the V164-8.0 MW, which was initially developed in 2012 and launched two years later – takes the energy generation record for a commercially available offshore wind turbine.
.. Continue Reading Massive wind turbine takes energy generation recordCategory: Environment
Tags: Related Articles:
- The U.S. dips a toe in the offshore windfarm water
- Swarms of sensor-packed drones may soon be a windfarmer's best friend
- World’s largest floating wind farm proposed for California waters
- Latest Hitachi turbines target light offshore winds
- World’s first floating wind farm to be built off Scottish coast
- Seatower's game-changing wind turbine foundations could reduce the cost of offshore wind farming
from New Atlas http://ift.tt/2kF0Y46
No comments:
Post a Comment