Boeing's latest iteration of its 737 MAX line rolled out today at the company's Renton, Washington plant, as the first 737 MAX 7 prototype left its hanger in a predawn ceremony watched by thousands of Boeing employees. Scheduled to go into service in 2019, the twin-engine jetliner will undergo system checks and engine runs before starting test flights in a few weeks.
.. Continue Reading First 737 MAX 7 debuts at Boeing's Renton factoryCategory: Aircraft
Tags: Related Articles:
- Boeing begins 777x production
- Self-drive nose wheel promises less time on the tarmac
- Boeing teams with FedEx Express on new ecoDemonstrator aircraft
- Advanced winglet on show as Boeing 737 MAX heads to final assembly
- Boeing 737 MAX takes off
- Bombardier delivers first wide-seated, big-windowed CS100 to SWISS
from New Atlas http://ift.tt/2BXb4Fa
No comments:
Post a Comment